إدارة الطوارئ في محطات معالجة مياه الصرف الصحي حالة دراسة: محطة الشمال في بيت لاهيا
DOI:
https://doi.org/10.53671/pturj.v7i3.77Corresponding Author :
Alaa Mahmoud MsalamKeywords:
Beit Lahia Station, Risk Assessment, Umm Al-Nasr Village, ResponseAbstract
The aim of this study is to identify the potential risks to the North Station (Beit Lahiya Station and the North Emergency Station), and to prepare emergency response procedures in the sewage treatment plant in Northern Gaza. The researchers followed the descriptive and analytical approach of the sources and reports issued by the institutions related to the sewage stations in the Gaza Strip. The study also included interviews with engineers at the station to analyze and assess the risks to the North station, to identify indicators to prevent flooding of Umm al-Nasr village, and to identify preventive measures to avoid disasters. The study also recommended the necessity of finishing the development of the North Emergency Station Project to accommodate the cumulative increase in the amount of treated water, as well as work on the preparation of contingency plans to deal with the expected risks and the preparation of preparedness and response procedures for each risk.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2019 Palestine Technical University Kadoorie Research Journal

This work is licensed under a Creative Commons Attribution 4.0 International License.
Guide for Authors